Album list
|
Search
|
Login
ATA
›
Gallery
›
Construction
›
Air
› June 13th 2001
The iron work for another footer, waiting to be placed, and concreted into the ground.
Tunnel work must now be almost complete, with soil now being placed into the sides to fill in the gaps between walls and ground.
2 images on 1 page(s)
How to: Submit a photo to the ATA gallery
| Powered by
Coppermine Photo Gallery